A temporary deviation can make an engineering exception visible and bounded. It becomes dangerous when “approved this time” loses its connection to a requirement, a lot or a permitted use. For a shield shipment, the record should explain what differs, why the difference is acceptable in a defined situation and when normal requirements resume.
Describe the difference before proposing acceptance
Identify the part number, drawing revision, affected characteristic and actual observed condition. Include the inspection method and evidence. Avoid descriptions such as “slightly high” or “minor cosmetic issue” when the underlying measurement or appearance criterion is available. The reviewer needs the original requirement and the difference side by side.
Determine whether the condition concerns geometry, material, coating, packaging or missing documentation. A deviation for one category should not silently authorize another. For example, accepting a packaging-label correction does not approve an unknown material substitution inside the same cartons.
Bound the affected population
List supplier lot identities, quantity, shipment references and any items already installed in assemblies. State whether the exception applies to a fixed number of parts, a particular order or a defined period. Use both quantity and expiry when needed to prevent unused authority being carried into later production.
- Identify stock at the supplier, in transit and at the customer.
- Define the method used to separate affected and unaffected items.
- Record which assemblies may receive the affected parts.
- Name the party responsible for maintaining the quantity balance.
- Specify what happens to unused stock when the exception expires.
A carton label can support segregation, but it should connect to a controlled record. If cartons are split during receiving, preserve the deviation identity on the smaller handling units or the associated material record.
Evaluate the real interface consequence
Ask how the difference could affect board clearance, frame-cover engagement, soldering, contact continuity, enclosure fit or the intended product tests. Select evidence that addresses the affected function. A visual inspection alone cannot establish that an altered contact feature is electrically equivalent under all operating conditions.
Consider a hypothetical batch of covers with an out-of-limit noncontact feature. An engineer may find that the feature clears the current enclosure but not another model in the same product family. The deviation can then be restricted to the evaluated assembly instead of approving the covers for every use associated with that part number.
Record authority, conditions and the return path
The approval should name the authorized reviewers, the evidence considered, the restrictions and the expiry. Keep commercial decisions separate from the engineering basis so a delivery concession is not mistaken for technical approval. NASA’s configuration-management guidance distinguishes controlled baseline changes from recorded configuration decisions; a temporary exception should not rewrite the released drawing by implication.
Define how subsequent production returns to the standard requirement. Request the corrective action or process clarification appropriate to the cause, and identify any additional checks for the next lot. Do not close the deviation simply because the affected stock has shipped if the continuing process issue remains unresolved.
Questions about temporary exceptions
Can a deviation be approved verbally to avoid delay?
Capture the decision in the agreed controlled system before affected material is used. An urgent conversation can start the review but should not be its only record.
Does the same exception automatically apply to the next lot?
No. Reuse requires a new or explicitly extended approval with current evidence, scope and authority. Repeated exceptions may signal a requirement or process problem.
Is a deviation always a design change?
Not necessarily. It can permit a bounded departure while the released requirement remains in force. A permanent change should follow the project’s change process.
Check the record at closure
Reconcile the approved quantity, actual use, remaining stock and any returned parts. Retain the technical decision with the affected shipment history. A closed deviation should make it possible to identify where the exception went and demonstrate that it did not quietly become the normal purchasing specification.
References and scope
- Information referenced from NASA — Systems Engineering Handbook: Crosscutting Technical Management, sections 6.5 and 6.6. General engineering-management reference; the shield-specific workflows are editorial recommendations, not NASA supplier requirements.